House I Love
  • Home
  • Cleaning
  • Decorating
    • DIY
  • Exterior Design
  • Green Living
  • Home Improvement
  • House Plans
    • Air Conditioning And Heating
    • Construction
    • Gardening
    • Plumbing
    • Roofing
    • Windows
  • Interior Design
    • Bath and Shower
    • Bedroom
    • Furniture
    • Kitchen
    • Painting
Home  /  Home Improvement  /  Electric Meter Box Installation Requirements

Electric Meter Box Installation Requirements

James Lewis September 16, 2026 Home Improvement Comments are off

Installing a meter box is a simple job that should be done correctly the first time to save delay and costly rework later. The requirements for siting, size and who can do the work are covered in this page.

Table of Contents

Toggle
  • Siting and Height Rules
  • Depth and Internal Dimensions
  • Weatherproofing Rating
  • Door Swing and Access
  • Who Can Do the Work

Siting and Height Rules

An outdoor electric meter box needs to be installed between 375mm and 1,500mm above finished ground levels. This is measured to the centre of the meter reading position. In addition, the outdoor electric meter box must be at least 300mm away from any gas meter and associated pipework.

Depth and Internal Dimensions

The internal depth of the meter box plus the meter, cut-out fuse and cables must be deep enough to allow for all the necessary components to be installed within the box without being forced. Typically this would be in excess of 210mm and require a large enough internal volume to house all the components listed above. The DNO’s technical standards should be checked in relation to the required cabinet size prior to order.

Weatherproofing Rating

The enclosure must be weatherproof enough to prevent rainfall getting in. This means at least IP44 (water splashing against enclosure from any direction; protection against solid objects with maximum size of 1mm). However, for particularly exposed situations, consideration should be given to taking the rating up to IP54. Electric Meter box is covered in more detail at www.meterbox.co.uk/electric-meter-boxes.

Door Swing and Access

The door to the meter box must open 180 degrees, and be able to be opened by the meter reader and DNO engineer. Also, nothing must be fixed against the cabinet (such as pipes, walls, etc) which could stop the door opening.

Who Can Do the Work

The civil work for installing an electric meter box can be completed by a builder or electrician, but connection to the electricity supply is a totally different issue. Connection to the live network must be completed by the DNO or an approved contractor.

Getting the details right the first time will save time and money and avoid an expensive return visit.

Previous Article
Next Article

About Author

James Lewis

Related Posts

  • The Strange Things You Discover When You Clear Out a Loft

    The Strange Things You Discover When You Clear Out a Loft

    September 21, 2026
  • How Electricians Spot Overloaded Circuits

    How Electricians Spot Overloaded Circuits

    September 15, 2026
  • Visitors browsing exhibitor booths at the Connecticut Convention Center home expo

    Connecticut Fall Home Show 2026: Dates, Tickets, and Schedule

    September 1, 2026

Categories

  • Air Conditioning And Heating
  • Bath and Shower
  • Bedroom
  • Cleaning
  • Construction
  • Decorating
  • DIY
  • Exterior Design
  • Fireplace
  • Floor
  • Furniture
  • Garage
  • Gardening
  • Green Living
  • Home Improvement
  • Home Security
  • House Plans
  • Interior Design
  • Kitchen
  • Lighting
  • Office Decoration
  • Painting
  • Plumbing
  • Reviews
  • Roofing
  • Swimming Pool
  • Windows

Archives

Pages

  • Home
  • About
  • Contact Us
  • Privacy Policy
Theme by ThemesPie | Proudly Powered by WordPress